A construction loan pays for a new home in stages as it is built, rather than in one amount at settlement, and interest is charged only on what has been drawn. In Victoria a builder’s deposit is capped at 5% on contracts of $20,000 or more, and a full build is usually paid at base (10%), frame (15%), lock-up (35%) and fixing (25%), with the rest at completion (Consumer Affairs Victoria, checked 19 November 2026).
Building a new home or a house and land package in Melbourne’s west? A construction loan pays your builder stage by stage. We compare 40+ lenders and keep the finance ahead of each stage.
A construction loan is a home loan paid out in stages while your home is built, instead of in one amount at settlement. If you are buying land, the land usually settles first. Then, as your builder finishes each stage and sends a claim, the lender releases that progress payment to the builder. You pay interest only on the amount drawn so far, so repayments grow as the build goes on. Some lenders let you pay interest only during construction and switch to principal and interest when the home is finished; terms vary by lender.
With a house and land package on separate contracts, the land settles first, often months before construction starts, and the build is drawn down from there. Stamp duty is assessed on the land contract only. Our house and land estate guides work through this estate by estate, and if your land is not titled yet, see home loan pre-approval for how we time the approval.
A fixed-price building contract with a registered builder, the plans and specifications, the building permit and the builder’s domestic building insurance. The lender then values the home “as if complete” from the plans, and lends against that value. Each lender sets its own conditions, so we check them against your contract before you apply.
Consumer Affairs Victoria suggests doing your own estimate, including every fixture and fitting you choose, and adding 15% for unplanned costs. It also warns that prime cost items and provisional sums, where the exact item or price is not set in the contract, can blow the budget. Site costs, driveways, fencing and landscaping are common gaps, and if you are renting during the build you will be paying rent and a growing loan repayment at the same time.
Consumer Affairs Victoria advises checking that each stage has passed the building surveyor’s inspection, meets the contract and is complete before you pay, and warns against paying in advance because home warranty insurance may not cover work paid for before it is done. You can engage your own building inspector to check each stage.
The Domestic Building Contracts Act 1995 sets the deposit and the stages. A builder’s deposit cannot be more than 5% on a contract of $20,000 or more (10% under $20,000). For a contract to build all stages, Consumer Affairs Victoria gives the usual schedule as:
| Stage | Paid when complete | Share of the contract price |
|---|---|---|
| Base | The slab or footings and base are finished, depending on the floor type | 10% |
| Frame | The frame is finished and approved by a building surveyor | 15% |
| Lock-up | External cladding, roof, flooring, external doors and windows are fixed | 35% |
| Fixing | Internal cladding, doors, cabinets, baths, basins and sinks are fitted | 25% |
The deposit and the final payment at completion make up the rest. A different schedule needs legal advice. The lender pays each stage once your builder claims it and you sign off.
The house and land calculator adds up the land, the build, stamp duty and the grant, the borrowing power calculator gives you a starting range, and the VIC stamp duty calculator shows the duty on your land.
The loan is released in stages as your home is built. The lender pays each progress claim from your builder, and you pay interest only on what has been drawn so far.
No. Interest is charged on the amount drawn, so it starts small and grows as each stage is paid.
No more than 5% on a building contract of $20,000 or more, and 10% under $20,000, according to Consumer Affairs Victoria.
It depends on the lender and your loan to value ratio. Above 80%, lenders usually charge Lenders Mortgage Insurance unless you qualify for the Australian Government 5% Deposit Scheme; check its current price caps at firsthomebuyers.gov.au.
Yes. The land settles first and the build is drawn down in stages after that. Stamp duty is on the land contract only.
Some lenders consider owner builder loans, usually with stricter conditions. Approval is subject to the lender’s assessment.
Obligation-free chat — message us now and we'll reply, usually within minutes, with what we need to compare lenders for you.